Abbreviation:-
- SHP= Small Hydro Project
- BG= Biomas Gasfier
- BP= Biomass Power
- U & I=Urban & Industrial Water Power
- RES=Renewable Sources
Note:-
- The SHP capacity of 1168 MW which was covered under the conventional Hydro capacity has been transferred to RES 59.97 MW of captive capacity has been deducted from total SHP capacity under RES.Similiary wind capacity of 148.67 MW covered under captive has also been deducted from wind power capacity under RES.
- The Shares of Sipat TPS(NTPC) are proposed shares, still to be approved.
- (**) Based on data as on 30.09.2007 as furnished by MNRE.
- Figures at second place of decimal may not tally due to rounding off by computer